TAPAN ENGINEERING SERVICESCertified IBR Erector
Back to All Industries
Thermal Power & IBRCertified IBR erector

Power Plants, Boilers

Mechanical contractor in thermal power plants, industrial utilities, and high-pressure steam boiler systems focusing on mechanical alignment, structural support, and IBR piping.

Power Plants, Boilers

Sector Operational Overview

Tapan Engineering Service operates as a mechanical contractor in thermal power plants, industrial utilities, and high-pressure steam boiler systems. The core of their work focuses on precision mechanical alignment, structural support, and high-pressure piping execution compliant with Indian Boiler Regulations (IBR).

Core Work Scope & Responsibilities

IBR Steam & High-Pressure Piping Erection

Fabrication, layout, fitting, and structural support installation for High-Pressure (HP) and Medium-Pressure (MP) steam lines, main feed-water systems, and blowdown networks.

Centrifugal, Vertical & Booster Pump Alignment

Precision laser alignment and dynamic positioning of boiler feed pumps (BFP), condensate extraction pumps, cooling water pumps, and high-head booster assemblies to eliminate operational vibration.

Boiler & Pressure Part Assembly

Positioning, structural alignment, and fit-up of boiler auxiliary components, including headers, steam drums, economizer loops, superheaters, and temporary support structures during plant overhauls or new installations.

Root Joint Inspection & Certified Welding

Executing high-spec root welding and joint preparations for thick-walled alloy steel piping, undergoing Non-Destructive Testing (NDT) such as Radiography Testing (RT) and Hydro-static Pressure Testing.

Plant Utility Network Integration

Executing plant-wide utility connections, including compressed air lines, cooling water loops, and heavy industrial gases (e.g., Oxygen, Nitrogen, APRDS) connecting boiler units to central plant utilities.

Planning Execution in Power Plants, Boilers?

Connect directly with our mechanical project managers to inspect your plant requirements.

Request Consultation